Two stock guides. Read them in this order.
Guide 1 · Read firstHold less without running out

Sets how much of each item you should keep: a cushion, when to reorder, and the most you should hold.

→
Guide 2 · You are hereTurn idle stock back into cash

Deals with the stock above that level: finds it, gets cash back from it, and stops it building up again.

Already know you have too much stock? You can start here. Section 02 gives you a quick stand-in for “how much you should keep” until you set it properly with Guide 1.

01 · Introduction

Get your cash back from stock you don’t need

Walk through most plants and you will find it: material bought for a job that was cancelled, parts for a design the customer changed, finished goods made for orders that never came, and a bulk buy taken for a discount that is still mostly on the shelf. Each of these is cash that has already left the bank and is now sitting in the warehouse.

Most owners know some of their stock is not needed. What stops them acting is not knowing exactly which items, worrying about running short if they cut too far, and not having a clear way to turn unwanted stock back into money. This guide takes you through all three, one step at a time, without putting production at risk.

Find it

Which items you will have too much of, once orders and needs are counted

Understand it

Why it built up, and who can fix the cause

Get cash back

A next step, an owner and a date for every item

Stop it returning

Simple checks on buying, design changes and cancellations

Keep it going

A 30-minute weekly review

Our example: what the company owns, and what it has ordered

Stock it already owns $950k
$520kMaterials
$300kFinished goods
$130kIn production

$820k of materials and finished goods is sorted in section 03. The $130k in production, called work in progress, is jobs started but not finished; it is handled in section 05.

Ordered, not yet received $60k
$25kNeeded
$35kMore than needed

Not part of the $950k. It becomes stock only when it arrives, which is why it can still be changed.

Figure 1. A $5 million building-products maker. All figures in this guide are examples.
The $820,000 of materials and finished goods, sorted into four groups (explained in section 03)
$545kUsed, right amount
$150kUsed, too much
$70k
$55k
Active, right-sizedActive but excessSlow-moving or at riskObsolete
Figure 2. Not all stock is idle, and not all idle stock is the same
Three ways this work improves cash, plus one cost
1Spend less

Cancel or shrink supplier orders you won’t need

$35kMoney that never leaves the bank. Nothing comes in.
2Buy less while you use it up

Stop reordering items you have too much of, and use what is already on the shelf

$150k over 3–6 monthsMoney stays in the bank week by week, as purchases are skipped.
3Get money back

Return or sell stock you can’t use, after the costs of doing it

$48k from stock that cost $125kThe only one where money actually comes in, usually well below what you paid.
−One necessary cost

Top up items you are short of, critical items first

$25kMoney you spend to protect production.

Report these four numbers separately to the owner and to any lender. They look alike because they are all in dollars, but they behave differently: one is money you did not spend, one arrives slowly over months, one is cash received, and one is cash spent. Adding them into one “savings” figure overstates what the work delivers and makes the next review harder to trust.

What does your stock cost to hold?

Days of stock99
Cash tied up in each day of stock$9,589
Rough yearly cost of holding$133,000

Example manufacturer, $950,000 of stock including production. The 6% for other costs is an example, and some costs, such as rent, do not fall when stock does. An estimate, not a saving.

Where the information lives

This guide pulls a few facts about each item from different parts of the business. You do not need special software, only to know where each fact is kept and who to ask.

What you needWhere it is usually keptWho to ask
Stock on hand by item, and what each unit costThe stock list in your accounting system or spreadsheetStorekeeper or accounts
12 months of use, and when each item last movedThe same stock records: what came in and what went outStorekeeper or planner
Orders placed with suppliersPurchase ordersBuyer
Jobs on the floorProduction jobs or work ordersProduction lead
Customer orders and forecastsThe order book and sales forecastsSales or customer service
Parts lists: the materials in each productOften called bills of materials; in the system or with engineeringEngineering or production
Design changes and products being phased outEngineering change recordsEngineering
In a small company, one person may keep several of these, often in spreadsheets. That is fine: the guide needs the numbers, not a particular system.

If you do only three things

1Check what you have ordered

Every week, before the goods arrive and become stock.

2Give every idle item a decision

One owner, one next step and a date, kept in one list: the action register.

3Review stock when anything changes

A customer cancellation or a design change triggers a review the same week.

02 · What’s left over

Work out what you will have left over

How long an item has sat on the shelf does not tell you whether you have too much of it. What matters is what will be left after you have met everything you need. Start with the idea, then follow one example, then the detail.

The idea in one line
What we have now

Usable materials and products

+
What is coming

Orders already placed with suppliers

−
What we need

Customer orders and other production needs

=
What we expect to have left

Then compare it with how much we should normally keep

Aluminum extrusions, looking three months ahead
On the shelf, usable

Extrusions you could use today

$80k
+
Coming from the supplier

A purchase order placed last month, due in six weeks

$40k
−
Customer orders

Orders customers have already placed that use aluminum

$25k
−
Other expected needs

What the production plan says you will use over the three months, beyond those orders

$35k
=
Left over in three months

Compared with the most you should normally hold: $20k

$60k $40k too much

The shelf alone looks fine. Without the open order, $80k − $25k − $35k = $20k, exactly the normal level. The $40k order on its way creates the excess, and because it has not arrived yet, you may still be able to change it.

Figure 3. Judge what will be left over, not what is on the shelf

What counts in each box

Usable stock: everything in the warehouse?

No. Only stock you could use or sell today. Leave out anything damaged, expired, on quality hold or made to an old design.

Coming in: which orders?

Purchase orders you have placed, not cancelled, that are due within the period. The supplier does not need to have confirmed a date.

Jobs on the floor: do I count them?

Usually not. Count only material from a paused or cancelled job that will go back on the shelf as this item, and never as stock you can use today.

Customer orders: which ones?

Orders customers have actually placed with you that need this item within the period.

Other expected needs: how do I know?

From the production plan or customer forecasts for the next few months. If you have neither, use average monthly use. Don’t count a customer order twice.

Over what period?

At least as long as the supplier takes to deliver this item. If the supplier takes four months, look four months ahead; if six, look six. Three months is a good start for items that arrive within three months.

What is a parts list?

The materials, and how much of each, in one unit of a product, also called a bill of materials. Multiply by planned production: 1,200 frames × 4 kg = 4,800 kg of aluminum.

Dollars or units?

Dollars to find the biggest problems first; units to decide what to do with each item.

The same idea as a formula, for your spreadsheet:

Left over  =  usable stock  +  orders coming in  +  usable material from stalled jobs  −  customer orders  −  other expected needs

All within the same period. Other expected needs exclude anything already counted as a customer order, so nothing is counted twice.

Build the list in a spreadsheet, one row per item, using the same item number across stock, purchase orders and customer orders. Items held only for a firm customer order are spoken for, not excess. Update the list weekly; a list that is a month old will flag the wrong items.

How much should we normally keep?

To call stock “too much”, you need a normal level to compare it with. Guide 1, Hold less without running out, sets four numbers for each item. Each has one job:

Safety stock

The minimum cushion you want to protect, for busy days and late deliveries

A floor: don’t plan to go below it
Reorder point

The level at which you order more

A trigger, not a level you sit at
Maximum

The most you want to have, right after an order arrives

A ceiling: this guide compares with it
Average stock

Roughly what you hold on a typical day

A guide to cash tied up, not a target
The four numbers for steel coil, checked weekly
Safety stock
Average21 Reorder point26 Maximum36
010203040 tons
11 tonsSafety stock

The floor

26 tonsReorder point

The trigger

36 tonsMaximum

The ceiling

about 21 tonsAverage stock

A typical day

Why is the average below the reorder point? Stock rises to the maximum when a delivery arrives and falls toward safety stock before the next one, so on a typical day you hold about half an order plus the cushion. The reorder point is only the signal to order.
Check the records before you act
Opening
+
Received
−
Used
−
Scrapped
=
Closing
Any difference is a record error to find, not stock to write off.Count the top 20 items and every critical item monthly, everything yearly.

03 · Four groups

Sort what you find into four groups

Too much stock is not one problem. Some of it will be used, just not soon; some of it may never be used. Each needs a different decision, so sort the items your list flags into four groups.

Active, right-sized

Used regularly, and you hold about the right amount

Steel coil used every week, with about a month on handKeep it; set safe levels
Active but excess

Still used regularly, but you hold far more than you need

Aluminum used every week, but a discount buy left eight months on the shelfStop reordering; use it up
Slow-moving or at risk

Use has dropped, or will stop before you finish it

Coating for a product line that sells less each year, or gaskets for a model being replaced next springDecide by a date: keep, use or clear
Obsolete

No current use at all

Brackets for a design the customer changed, or sealant past its expiry dateChoose a way to recover value
The difference that matters most: excess is the right item, too much of it. Slow-moving is an item whose demand is itself fading.

Only sort items your list flags: more left over than the maximum, no movement for a long time, a design change, or stock bought for one customer. Engineering or quality answers the first question below, and the planner or buyer the other three. Note each item’s group in the action register, so every flagged item is in one place.

Is it usable and still approved for current products?Look at: current parts lists, quality holds, expiry dates
No
Obsolete
Yes
Will you use it before a known change: an expiry date, a new design or the end of a product?Look at: design change records, product end dates, shelf life
No
Slow-moving or at risk
Yes
Is there a reason to keep it: regular use, a customer order, a service contract or a critical part?Look at: 12 months of use, the order book, service contracts, the critical list
No
Slow-moving or at risk
Yes
Will more be left over than the maximum?Look at: your left-over figure from section 02
Yes
Active but excess
No
Active, right-sized
Figure 4. Four questions, and where to find each answer
Why age alone misleads: six situations
A spare part used once every 18 months
Looks idle→Active, if the need is confirmed

Hold a deliberate quantity for equipment or contracts you support

Steel bought for an order that was cancelled
Looks new→At risk at once

Start the cancellation steps (section 06)

An old component revision
Looks normal→Obsolete once not approved

Whatever its use history says

Finished goods awaiting a customer release
Looks idle→Committed

Leave out of excess while the order is firm

Bulk bought to meet a supplier minimum
Looks active→Active but excess

Stop reordering until it runs down

A material used often, in falling quantities
Looks fine→Active, at risk of excess

Cut order sizes now

Two of these need a named person to confirm them. Sales confirms that finished goods are truly spoken for, with a firm order and a ship date. Engineering or service confirms that a rarely used spare part is still needed, and for which equipment or contract. Without that confirmation, treat the item as at risk.

No movement in 90 or 180 days, or no use in 12 months, are reasons to look, not verdicts. Set these limits by type of item, shelf life and product life.

230 items$545kActive, right-sized

Keep; set safe levels

70 items$150kActive but excess

Stop reordering; use it up

66 items$70kSlow-moving or at risk

Keep or clear, decided by a date

54 items$55kObsolete

Choose a way to recover value

Figure 5. The example manufacturer’s 420 materials and finished goods, by group

04 · Why it built up

Find out why the stock built up

Clearing stock without knowing why means buying it again. Give each flagged item one reason; where two apply, choose the one you can change.

The reason is usually in the paperwork: the purchase order shows who bought it and when, the customer order shows whether it was cancelled, and the design change records show whether the item was superseded. Ask the person who placed the order before guessing. Once every item has a reason, add up the value by reason. The largest bar shows which control to fix first, and its owner.

Main reasonExample manufacturer’s idle stockWhat to change
Forecast too highDemand that did not arrive
$60k
Name an owner for each forecastSales
Supplier minimum or bulk buyBought to meet a minimum or a discount
$55k
Smaller lots; approve large buysPurchasing
Customer cancelledMaterials for an order that stopped
$45k
Agree who pays, in advanceSales
Engineering changeOld revision no longer usable
$40k
Link changes to a stock reviewEngineering
Made too earlyFinished before firm demand
$35k
Release jobs against demandProduction
Unreliable suppliersBuffers built for late deliveries
$20k
Fix supplier performance firstPurchasing
New product launchFirst estimates were wrong
$10k
Review quantities at 3 monthsSales
Wrong recordsReordered stock already on the shelf
$10k
Fix recording; check before orderingPlanning
Figure 6. Why the example’s $275,000 of idle stock built up, and who owns the fix

05 · Get cash back

Get cash back, safest step first

Work through the action register starting with the items worth the most, but bring forward anything with a deadline: a supplier’s return window, a customer’s agreement or an expiry date. Start where nothing can go wrong for production, and leave the decisions that need judgment until the safe steps are under way.

0
Top up critical shortages

Bring items below what you need back up, critical ones first.

$25k spent
1
Change supplier orders you won’t need

Cancel, reduce or delay them, where the supplier’s terms allow.

$35k not spent
2
Stop reordering items you have too much of

Normal production uses them up.

$150k over 3–6 months
3
Decide what to do with slow-moving and obsolete items

Item by item, with an owner and a date.

About $48k back from $125k
Lowest riskNeeds most judgment
Figure 7. The example manufacturer’s plan, safest step first

For each slow-moving or obsolete item, estimate what two or three options would actually bring in, after their costs, before choosing one, and note the estimate in the action register. Accept a low amount when the space, insurance or handling the item takes costs more than waiting for a better offer. Note what you actually received when the item is closed, so the next estimate is better.

Usually recovers the mostUsually recovers the least
1
Reuse in another product

Fits the current drawing; engineering and quality approve

Engineering
2
Rework or modify

Rework and inspection cost less than the value saved

Engineering, quality
3
Move to another site or line

Real demand there; moving cost

Planning
4
Return to the supplier

Return terms, condition, restocking fee

Purchasing
5
Recover from the customer

A signed agreement makes it theirs

Sales
6
Sell to another buyer

Certification, traceability, design and brand rights

Sales, operations
7
Scrap or recycle

Salvage value; safety and environmental rules

Operations, finance
Figure 8. Seven ways to deal with idle stock, from the one that usually recovers the most
Money back = what you receive − what it costs to get it (return fees, rework, testing, freight, repacking, commissions)
Bronze coating: 40 pails that cost $4,800, last used 14 months ago
Return to supplier$3,450
Sell through a broker$1,650
Dispose of safely−$400
Return: $4,800 credit less a 25% restocking fee and $150 freight. Broker: $2,000 less $200 commission and $150 freight. Disposal: hazardous-waste handling.
Figure 9. Compare options on the money you actually get back, not on what the stock cost
Before you act
Finding buyers

Other manufacturers using the same material, customers running the equipment your spare parts fit, brokers and industrial auctions. Sales owns it.

Stock bought for one customer

Charge a customer only where a contract or signed agreement makes them take or pay for the stock. An order or emails are not enough.

Safety and rights

No sale that compromises safety, quality, certification or traceability. Hazardous or recalled goods need proper handling; a customer’s design or brand needs its permission.

Tell finance first

Selling or scrapping stock below what it cost can change the accounts. See the note below.

To find buyers, prepare a short surplus list: item, description, quantity, condition, certificates, photos and an asking price, with a lowest price below which you would rather scrap or keep it. Send it first to customers who use the material, then to brokers. Set a closing date, so offers do not drift.

Jobs that have stalled on the floor

Work in progress means jobs that have started production but are not finished. When a job stalls, the materials in it are stuck too. Some can go back on the shelf; some cannot. Look at each stalled job piece by piece.

Job 1187: window frames for an order the customer cancelled · $7,000 in the job
$3,000
Aluminum tube, cut but not yet welded

Fits other frames: goes back to stock

Back on the shelf
$2,500
Brackets machined to this customer’s design

No other use: recover from the customer if your agreement allows, otherwise sell or scrap

Depends on the agreement
$1,500
Labor already spent

Cannot be recovered from the materials

Gone
Figure 10. What can and cannot be recovered from one stalled job
Four kinds of stalled job
Job for a cancelled order $7k

Recover the cost if the agreement allows; return unused materials to stock

Waiting for customer approval $5k

Set a date with the customer; pause the job until it is confirmed

Kit with parts missing

Finish when the parts arrive, or release the other parts for other jobs

Started long before it is due

Pause it if that frees materials or machine time for nearer orders

Track each stalled job:JobCustomerStageMaterial valueWork remainingCustomer decision dateMaterial you could recoverOwner

06 · Stop it coming back

Stop idle stock building up again

Clearing unwanted stock without changing how you buy tends to bring it back. Most of it is stopped by three simple checks. All three sit with purchasing and planning, and none needs new software.

1Every week, check orders before the goods arrive: one example
Normal use100units a month
Usable now250units
Already ordered300units
Needed in the next 2 months200units
Left after 2 months: 250 + 300 − 200 = 350 units  ÷  100 a month = 3.5 months of use

The company’s rule: an order that would leave more than 3 months of use after the period needs the owner’s sign-off. This one does, so the buyer brings three options:

Reduce it

Cut the order to 150 units, leaving 2 months of use

Delay it

Move delivery out, so it arrives when it is needed

Split it

Keep the total, but have the supplier deliver smaller amounts over time

Figure 11. Checking one purchase order before it arrives

Months of use is simply units left over divided by normal monthly use. Measuring orders this way lets one rule work for every item, cheap or expensive. Three months is an example; set your own limit, and use a longer one for items with long supplier lead times. Before the weekly review, the buyer and planner spend about 15 minutes running this check on open orders, and bring only the ones that need a decision.

The same check, for every open order
Stock

How much usable stock do we have?

Incoming

What is due to arrive, and when?

Needs

What do customer orders and the plan need?

Too much?

Will this order take it above the maximum?

Action

Reduce, delay, cancel or split?

Approval

Who signed off?

2Approve any order that takes an item above its maximum
Order approvalAbove the maximum · a supplier discount alone is not a reason
Approved byDate

Delivering smaller amounts over time: you agree the total with the supplier, and it ships in parts as you need them. Suppliers may call this a blanket order with releases. Keep the signed approvals; they show which large buys paid off and which became idle stock.

Make one person responsible for raising each warning: sales for cancellations and forecast changes, engineering for design changes and products being phased out, purchasing for supplier changes. A warning raised on Monday should be in that week’s review.

3Review stock the same week any of these happens
Review stock
the same week
when any of these happens

A customer cancels or changes an order

A design changes

A new product launches

A product is discontinued

A customer cuts its forecast

A supplier changes its minimum or lead time

An item passes your no-movement flag

Figure 12. Seven events that should trigger a stock review
1Engineering

Names the parts, products and date affected, and tells every team.

2Planning

Works out what is still needed: open orders, jobs, warranty and service.

3Purchasing

Stops or reduces open orders where allowed; agrees any final purchase before a part is discontinued.

4Sales

Confirms whether the customer takes or pays for stock bought for it.

5Operations and finance

Decide what to do with the rest, using section 05, with named approvals.

Figure 13. When a design changes, a product ends or a customer cancels

In the example, an equipment maker changes a custom bracket in November, with a December steel delivery still due. Planning confirms 300 old-design brackets are still needed; purchasing cuts the delivery to that, and sales asks the customer to take the rest under its supply agreement. Stop automatic reordering, not all buying: a service contract may justify one deliberate final purchase, sometimes called a last-time buy, before a part is discontinued.

Also approve every new item number before it is created, and judge buyers on total cost, including stock left over, not on unit price alone.

For stock bought for one customer, the agreement should list the materials and parts bought only for it, how much notice the customer gives before cancelling or changing a design, and what the customer pays for stock and work already committed. Put it in the supply agreement for regular customers and in the order confirmation for one-off jobs.

07 · Make it routine

Make the review a routine

No planning department needed: name each role, even if one person holds several, and keep a short weekly rhythm.

Purchasing

Stops or changes purchase orders

Production

Confirms needs and critical items

Sales

Confirms future customer demand

Action registerKept by the planner or storekeeper, with the left-over list
Engineering or quality

Approves substitutions and rework

Finance

Assesses reserves and write-offs

Owner

Approves large write-offs and exceptions

A first list for your largest items takes a few hours. Matching stock, orders, jobs, parts lists and design changes across every item takes longer, especially where item numbers differ between files, so expect the full list to build over several weeks. Start with the first weekly review even if the register is short. Keep the same day and time, bring the left-over list and the open purchase orders, and end every item with an owner and a date. Within a few weeks the register becomes the place where stock decisions are made.

5 minNew exceptionsItems that became excess, slow, expired or out of date
7 minIncoming ordersDecide orders flagged in the order check
5 minCritical shortagesReplenish to protect production
8 minRoutes under wayDone, and what is blocked
5 minDecisionsWho must approve what
0 min102030
Output: an updated action register, each item with one owner, a next action and a date
Figure 14. The 30-minute weekly stock review, where decisions are made; timings are a suggestion
Week 1Match stock, orders, jobs and customer orders for the top 20–30 items; flag themLeft-over list
Week 2Put flagged items in a group, with a reasonPrioritized list
Week 3Decide routes for the biggest and riskiest itemsAction register
Week 4Change orders, stop reordering, start returnsFirst recoveries
Weeks 5–8Pilot new levels on about 20 items; watch shortagesProof it is safe
ThenWeekly order check, then the stock review · Monthly sales, production, purchasing and finance compare demand with plans and orders · Quarterly re-check all groups and checks
Figure 15. The first eight weeks, then the rhythm that keeps it going

The monthly demand and supply check is what keeps buying in step with selling. In a small company it can be the owner, the sales lead, the production lead and the buyer, for an hour. Sales brings the demand outlook and any customer changes; production brings the plan for the next two to three months; purchasing brings open orders. Together they agree which orders to change, which items to watch and which decisions go to the owner, and note them in the action register.

Measures to track

Idle stockDown

Excess, slow-moving and obsolete stock, by group

Value recoveredUp

Money back ÷ what the cleared stock cost

Orders above needDown

Open orders that would take items above the maximum

ShortagesDown

Jobs or shipments delayed by a missing item

Overdue actionsDown

Register actions past their decision date

Days of stockDown

Stock value ÷ (yearly cost of goods sold ÷ 365)

Source: FASB Accounting Standards Codification 330-10-35 (subsequent measurement of inventory, lower of cost and net realizable value).

08 · Working templates

Idle stock templates

Stock toolkit (Excel)Every template in this section as a spreadsheet, each with a filled-in example, led by the action register. The same workbook covers setting safe stock levels.
Download

1. Action register the live worklist; reviewed weekly

ItemOn handBook valueGroupReasonNext stepExpected money backOwnerApproval byDecide byStatusActual money back
Bronze coating40 pails$4,800ObsoleteCustomer demand endedReturn to supplier$3,450PurchasingOperations managerNov 30Awaiting supplierOn closing

2. Left-over list one row per item; values or units

ItemUsable on handOn orderFrom stalled jobsCustomer ordersOther expected needsLeft overMaximumExcessLast usedCurrent design?Critical?

3. Weekly order check weekly

POSupplierItemValueDueMonths of use leftKeep, reduce, delay, cancel or splitSupplier agreedApproved by

4. Change and cancellation log every design change, phase-out or cancellation

DateChangeItems affectedStill neededOpen orders changedCustomer responsible?Remaining stockOwnerClosed

5. Monthly review

MonthExcessSlow or at riskObsoleteMoney backOrders above needShortagesOverdue actionsDays of stock

6. Stalled jobs reviewed weekly until each is closed

JobCustomerStageMaterial valueWork remainingCustomer decision dateMaterial you could recoverOwner
Job 1187Contractor 4Cut, not welded$7,000Welding, finishCancelled$3,000 of tube to stockProduction

7. What to say

WhenMessage
Change an open order“Our requirement for [item] has changed. Could we reduce PO [number] to [quantity], or move delivery from [date] to [date], with no change to price?”
Return to supplier“We hold [quantity] of [item], unused and in original packaging, bought on [date]. Could you take it back, and what credit and restocking fee would apply?”
Customer stock after a change“Following the change to [part], we hold [quantity] of material bought only for your orders, worth [amount]. Under our agreement of [date], could we arrange for you to take or pay for it?”
Offer to another buyer“We have [quantity] of [material or part], new and with full traceability, available at [price]. Would it fit your current or upcoming jobs?”
Agree in advance“Before we buy materials for this order, can we confirm in writing who takes any dedicated material left over if the order is cancelled or the design changes?”