Sets how much of each item you should keep: a cushion, when to reorder, and the most you should hold.
→Deals with the stock above that level: finds it, gets cash back from it, and stops it building up again.
Already know you have too much stock? You can start here. Section 02 gives you a quick stand-in for “how much you should keep” until you set it properly with Guide 1.
01 · Introduction
Get your cash back from stock you don’t need
Walk through most plants and you will find it: material bought for a job that was cancelled, parts for a design the customer changed, finished goods made for orders that never came, and a bulk buy taken for a discount that is still mostly on the shelf. Each of these is cash that has already left the bank and is now sitting in the warehouse.
Most owners know some of their stock is not needed. What stops them acting is not knowing exactly which items, worrying about running short if they cut too far, and not having a clear way to turn unwanted stock back into money. This guide takes you through all three, one step at a time, without putting production at risk.
Which items you will have too much of, once orders and needs are counted
Why it built up, and who can fix the cause
A next step, an owner and a date for every item
Simple checks on buying, design changes and cancellations
A 30-minute weekly review
Our example: what the company owns, and what it has ordered
Stock it already owns $950k
$820k of materials and finished goods is sorted in section 03. The $130k in production, called work in progress, is jobs started but not finished; it is handled in section 05.
Ordered, not yet received $60k
Not part of the $950k. It becomes stock only when it arrives, which is why it can still be changed.
Cancel or shrink supplier orders you won’t need
$35kMoney that never leaves the bank. Nothing comes in.Stop reordering items you have too much of, and use what is already on the shelf
$150k over 3–6 monthsMoney stays in the bank week by week, as purchases are skipped.Return or sell stock you can’t use, after the costs of doing it
$48k from stock that cost $125kThe only one where money actually comes in, usually well below what you paid.Top up items you are short of, critical items first
$25kMoney you spend to protect production.Report these four numbers separately to the owner and to any lender. They look alike because they are all in dollars, but they behave differently: one is money you did not spend, one arrives slowly over months, one is cash received, and one is cash spent. Adding them into one “savings” figure overstates what the work delivers and makes the next review harder to trust.
What does your stock cost to hold?
Example manufacturer, $950,000 of stock including production. The 6% for other costs is an example, and some costs, such as rent, do not fall when stock does. An estimate, not a saving.
Where the information lives
This guide pulls a few facts about each item from different parts of the business. You do not need special software, only to know where each fact is kept and who to ask.
If you do only three things
Every week, before the goods arrive and become stock.
One owner, one next step and a date, kept in one list: the action register.
A customer cancellation or a design change triggers a review the same week.
02 · What’s left over
Work out what you will have left over
How long an item has sat on the shelf does not tell you whether you have too much of it. What matters is what will be left after you have met everything you need. Start with the idea, then follow one example, then the detail.
Usable materials and products
Orders already placed with suppliers
Customer orders and other production needs
Then compare it with how much we should normally keep
Extrusions you could use today
A purchase order placed last month, due in six weeks
Orders customers have already placed that use aluminum
What the production plan says you will use over the three months, beyond those orders
Compared with the most you should normally hold: $20k
The shelf alone looks fine. Without the open order, $80k − $25k − $35k = $20k, exactly the normal level. The $40k order on its way creates the excess, and because it has not arrived yet, you may still be able to change it.
What counts in each box
No. Only stock you could use or sell today. Leave out anything damaged, expired, on quality hold or made to an old design.
Purchase orders you have placed, not cancelled, that are due within the period. The supplier does not need to have confirmed a date.
Usually not. Count only material from a paused or cancelled job that will go back on the shelf as this item, and never as stock you can use today.
Orders customers have actually placed with you that need this item within the period.
From the production plan or customer forecasts for the next few months. If you have neither, use average monthly use. Don’t count a customer order twice.
At least as long as the supplier takes to deliver this item. If the supplier takes four months, look four months ahead; if six, look six. Three months is a good start for items that arrive within three months.
The materials, and how much of each, in one unit of a product, also called a bill of materials. Multiply by planned production: 1,200 frames × 4 kg = 4,800 kg of aluminum.
Dollars to find the biggest problems first; units to decide what to do with each item.
The same idea as a formula, for your spreadsheet:
Left over = usable stock + orders coming in + usable material from stalled jobs − customer orders − other expected needs
All within the same period. Other expected needs exclude anything already counted as a customer order, so nothing is counted twice.
Build the list in a spreadsheet, one row per item, using the same item number across stock, purchase orders and customer orders. Items held only for a firm customer order are spoken for, not excess. Update the list weekly; a list that is a month old will flag the wrong items.
How much should we normally keep?
To call stock “too much”, you need a normal level to compare it with. Guide 1, Hold less without running out, sets four numbers for each item. Each has one job:
The minimum cushion you want to protect, for busy days and late deliveries
A floor: don’t plan to go below itThe level at which you order more
A trigger, not a level you sit atThe most you want to have, right after an order arrives
A ceiling: this guide compares with itRoughly what you hold on a typical day
A guide to cash tied up, not a targetThe floor
The trigger
The ceiling
A typical day
03 · Four groups
Sort what you find into four groups
Too much stock is not one problem. Some of it will be used, just not soon; some of it may never be used. Each needs a different decision, so sort the items your list flags into four groups.
Used regularly, and you hold about the right amount
Steel coil used every week, with about a month on handKeep it; set safe levels
Still used regularly, but you hold far more than you need
Aluminum used every week, but a discount buy left eight months on the shelfStop reordering; use it up
Use has dropped, or will stop before you finish it
Coating for a product line that sells less each year, or gaskets for a model being replaced next springDecide by a date: keep, use or clear
No current use at all
Brackets for a design the customer changed, or sealant past its expiry dateChoose a way to recover value
Only sort items your list flags: more left over than the maximum, no movement for a long time, a design change, or stock bought for one customer. Engineering or quality answers the first question below, and the planner or buyer the other three. Note each item’s group in the action register, so every flagged item is in one place.
Hold a deliberate quantity for equipment or contracts you support
Start the cancellation steps (section 06)
Whatever its use history says
Leave out of excess while the order is firm
Stop reordering until it runs down
Cut order sizes now
Two of these need a named person to confirm them. Sales confirms that finished goods are truly spoken for, with a firm order and a ship date. Engineering or service confirms that a rarely used spare part is still needed, and for which equipment or contract. Without that confirmation, treat the item as at risk.
No movement in 90 or 180 days, or no use in 12 months, are reasons to look, not verdicts. Set these limits by type of item, shelf life and product life.
Keep; set safe levels
Stop reordering; use it up
Keep or clear, decided by a date
Choose a way to recover value
04 · Why it built up
Find out why the stock built up
Clearing stock without knowing why means buying it again. Give each flagged item one reason; where two apply, choose the one you can change.
The reason is usually in the paperwork: the purchase order shows who bought it and when, the customer order shows whether it was cancelled, and the design change records show whether the item was superseded. Ask the person who placed the order before guessing. Once every item has a reason, add up the value by reason. The largest bar shows which control to fix first, and its owner.
05 · Get cash back
Get cash back, safest step first
Work through the action register starting with the items worth the most, but bring forward anything with a deadline: a supplier’s return window, a customer’s agreement or an expiry date. Start where nothing can go wrong for production, and leave the decisions that need judgment until the safe steps are under way.
Bring items below what you need back up, critical ones first.
Cancel, reduce or delay them, where the supplier’s terms allow.
Normal production uses them up.
Item by item, with an owner and a date.
For each slow-moving or obsolete item, estimate what two or three options would actually bring in, after their costs, before choosing one, and note the estimate in the action register. Accept a low amount when the space, insurance or handling the item takes costs more than waiting for a better offer. Note what you actually received when the item is closed, so the next estimate is better.
Fits the current drawing; engineering and quality approve
Rework and inspection cost less than the value saved
Real demand there; moving cost
Return terms, condition, restocking fee
A signed agreement makes it theirs
Certification, traceability, design and brand rights
Salvage value; safety and environmental rules
Other manufacturers using the same material, customers running the equipment your spare parts fit, brokers and industrial auctions. Sales owns it.
Charge a customer only where a contract or signed agreement makes them take or pay for the stock. An order or emails are not enough.
No sale that compromises safety, quality, certification or traceability. Hazardous or recalled goods need proper handling; a customer’s design or brand needs its permission.
Selling or scrapping stock below what it cost can change the accounts. See the note below.
To find buyers, prepare a short surplus list: item, description, quantity, condition, certificates, photos and an asking price, with a lowest price below which you would rather scrap or keep it. Send it first to customers who use the material, then to brokers. Set a closing date, so offers do not drift.
Jobs that have stalled on the floor
Work in progress means jobs that have started production but are not finished. When a job stalls, the materials in it are stuck too. Some can go back on the shelf; some cannot. Look at each stalled job piece by piece.
Fits other frames: goes back to stock
No other use: recover from the customer if your agreement allows, otherwise sell or scrap
Cannot be recovered from the materials
Recover the cost if the agreement allows; return unused materials to stock
Set a date with the customer; pause the job until it is confirmed
Finish when the parts arrive, or release the other parts for other jobs
Pause it if that frees materials or machine time for nearer orders
06 · Stop it coming back
Stop idle stock building up again
Clearing unwanted stock without changing how you buy tends to bring it back. Most of it is stopped by three simple checks. All three sit with purchasing and planning, and none needs new software.
The company’s rule: an order that would leave more than 3 months of use after the period needs the owner’s sign-off. This one does, so the buyer brings three options:
Cut the order to 150 units, leaving 2 months of use
Move delivery out, so it arrives when it is needed
Keep the total, but have the supplier deliver smaller amounts over time
Months of use is simply units left over divided by normal monthly use. Measuring orders this way lets one rule work for every item, cheap or expensive. Three months is an example; set your own limit, and use a longer one for items with long supplier lead times. Before the weekly review, the buyer and planner spend about 15 minutes running this check on open orders, and bring only the ones that need a decision.
How much usable stock do we have?
What is due to arrive, and when?
What do customer orders and the plan need?
Will this order take it above the maximum?
Reduce, delay, cancel or split?
Who signed off?
Delivering smaller amounts over time: you agree the total with the supplier, and it ships in parts as you need them. Suppliers may call this a blanket order with releases. Keep the signed approvals; they show which large buys paid off and which became idle stock.
Make one person responsible for raising each warning: sales for cancellations and forecast changes, engineering for design changes and products being phased out, purchasing for supplier changes. A warning raised on Monday should be in that week’s review.
the same weekwhen any of these happens
A customer cancels or changes an order
A design changes
A new product launches
A product is discontinued
A customer cuts its forecast
A supplier changes its minimum or lead time
An item passes your no-movement flag
Names the parts, products and date affected, and tells every team.
Works out what is still needed: open orders, jobs, warranty and service.
Stops or reduces open orders where allowed; agrees any final purchase before a part is discontinued.
Confirms whether the customer takes or pays for stock bought for it.
Decide what to do with the rest, using section 05, with named approvals.
In the example, an equipment maker changes a custom bracket in November, with a December steel delivery still due. Planning confirms 300 old-design brackets are still needed; purchasing cuts the delivery to that, and sales asks the customer to take the rest under its supply agreement. Stop automatic reordering, not all buying: a service contract may justify one deliberate final purchase, sometimes called a last-time buy, before a part is discontinued.
Also approve every new item number before it is created, and judge buyers on total cost, including stock left over, not on unit price alone.
For stock bought for one customer, the agreement should list the materials and parts bought only for it, how much notice the customer gives before cancelling or changing a design, and what the customer pays for stock and work already committed. Put it in the supply agreement for regular customers and in the order confirmation for one-off jobs.
07 · Make it routine
Make the review a routine
No planning department needed: name each role, even if one person holds several, and keep a short weekly rhythm.
Stops or changes purchase orders
Confirms needs and critical items
Confirms future customer demand
Approves substitutions and rework
Assesses reserves and write-offs
Approves large write-offs and exceptions
A first list for your largest items takes a few hours. Matching stock, orders, jobs, parts lists and design changes across every item takes longer, especially where item numbers differ between files, so expect the full list to build over several weeks. Start with the first weekly review even if the register is short. Keep the same day and time, bring the left-over list and the open purchase orders, and end every item with an owner and a date. Within a few weeks the register becomes the place where stock decisions are made.
The monthly demand and supply check is what keeps buying in step with selling. In a small company it can be the owner, the sales lead, the production lead and the buyer, for an hour. Sales brings the demand outlook and any customer changes; production brings the plan for the next two to three months; purchasing brings open orders. Together they agree which orders to change, which items to watch and which decisions go to the owner, and note them in the action register.
Measures to track
Excess, slow-moving and obsolete stock, by group
Money back ÷ what the cleared stock cost
Open orders that would take items above the maximum
Jobs or shipments delayed by a missing item
Register actions past their decision date
Stock value ÷ (yearly cost of goods sold ÷ 365)
Source: FASB Accounting Standards Codification 330-10-35 (subsequent measurement of inventory, lower of cost and net realizable value).
1. Action register the live worklist; reviewed weekly
| Item | On hand | Book value | Group | Reason | Next step | Expected money back | Owner | Approval by | Decide by | Status | Actual money back |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Bronze coating | 40 pails | $4,800 | Obsolete | Customer demand ended | Return to supplier | $3,450 | Purchasing | Operations manager | Nov 30 | Awaiting supplier | On closing |
2. Left-over list one row per item; values or units
| Item | Usable on hand | On order | From stalled jobs | Customer orders | Other expected needs | Left over | Maximum | Excess | Last used | Current design? | Critical? |
|---|---|---|---|---|---|---|---|---|---|---|---|
3. Weekly order check weekly
| PO | Supplier | Item | Value | Due | Months of use left | Keep, reduce, delay, cancel or split | Supplier agreed | Approved by |
|---|---|---|---|---|---|---|---|---|
4. Change and cancellation log every design change, phase-out or cancellation
| Date | Change | Items affected | Still needed | Open orders changed | Customer responsible? | Remaining stock | Owner | Closed |
|---|---|---|---|---|---|---|---|---|
5. Monthly review
| Month | Excess | Slow or at risk | Obsolete | Money back | Orders above need | Shortages | Overdue actions | Days of stock |
|---|---|---|---|---|---|---|---|---|
6. Stalled jobs reviewed weekly until each is closed
| Job | Customer | Stage | Material value | Work remaining | Customer decision date | Material you could recover | Owner |
|---|---|---|---|---|---|---|---|
| Job 1187 | Contractor 4 | Cut, not welded | $7,000 | Welding, finish | Cancelled | $3,000 of tube to stock | Production |
7. What to say
| When | Message |
|---|---|
| Change an open order | “Our requirement for [item] has changed. Could we reduce PO [number] to [quantity], or move delivery from [date] to [date], with no change to price?” |
| Return to supplier | “We hold [quantity] of [item], unused and in original packaging, bought on [date]. Could you take it back, and what credit and restocking fee would apply?” |
| Customer stock after a change | “Following the change to [part], we hold [quantity] of material bought only for your orders, worth [amount]. Under our agreement of [date], could we arrange for you to take or pay for it?” |
| Offer to another buyer | “We have [quantity] of [material or part], new and with full traceability, available at [price]. Would it fit your current or upcoming jobs?” |
| Agree in advance | “Before we buy materials for this order, can we confirm in writing who takes any dedicated material left over if the order is cancelled or the design changes?” |