01 · Introduction
Every day after the billing event counts
When the agreed billing event has occurred, every delay in preparing and successfully submitting the invoice can push back the customer’s payment. Check each customer’s terms to confirm what starts its payment clock: the invoice date, receipt of the invoice, delivery, acceptance or a milestone.
accepted
(shipped)
received
the bank
Where terms count from delivery or the invoice date, a late invoice may not move the due date, but it can still miss the customer’s approval and payment run, and it leaves nothing to follow up on until it arrives.
What is your billing gap worth?
Filled in for the example manufacturer, with $5 million of annual credit sales. Opportunity = annual credit sales ÷ 365 × (current days − target days). Interest = opportunity × borrowing rate, assuming it reduces borrowing for a full year. Use this estimate where earlier submission advances the customer’s payment process. For terms measured from delivery or acceptance, check whether late submission actually delays the customer’s payment run before counting the full gap. An estimate, not a forecast.
This guide sets out a billing routine a small team can run without new systems: bring the information together, know when each order can be billed, meet each customer’s requirements, tie out shipments to invoices every day, and clear what cannot be billed yet.
You will need
- Three months of shipments, with ship dates
- The invoices for those shipments, with the date each was submitted
- Open orders, including staged and long jobs
- Each large customer’s invoicing instructions
Our example manufacturer
A $5 million building-products maker selling to an equipment maker, a home-improvement chain, a regional distributor and seven contractors. All figures are illustrative.
If you do only three things
One row per billing event, with its own reference, kept by one owner and fed by every department.
Everything shipped today is either invoiced today or logged with a reason and an owner.
Write down each customer’s invoicing requirements before the next invoice goes out.
Written for machine shops, food producers, building-products makers, electronics assemblers and other small and medium-sized manufacturers that sell on credit.
02 · One register
Put billing information in one place
Billing stalls when the facts it needs sit with different people. Shipping knows what left, quality holds the certificates, sales knows the agreed price and the customer’s PO, and billing waits for all of it. Bring those facts into one register, with one row for each billing event, that every department feeds and one owner keeps.
An order number alone is not enough to key the register: one order can ship in several loads, releases or stages, and each may need its own invoice. Give every billing event its own reference, built from the order number.
One invoice covers several shipments
Each shipment keeps its own row. The rows share the invoice number.
One shipment needs several invoices
For example, goods and tooling billed separately: one row per invoice, with a suffix, such as 4510-S2-A and 4510-S2-B.
How to do itThe minimum information to record
| Information | Where it comes from | Who records it |
|---|---|---|
| Billing-event reference | Order number plus a shipment, delivery or stage number | Billing |
| Customer, order, PO or release, and shipment or delivery reference | Order confirmation, customer PO, packing slip | Sales or customer service; shipping |
| Items and quantity ordered | Customer PO | Sales or customer service |
| Quantity shipped and ship date | Packing slip, shipping log | Shipping |
| Billing event and its date | Order confirmation, proof of delivery, sign-off | Billing |
| Documents required, and whether each is ready | Customer requirements profile, quality records | Billing, quality |
| Invoice number and date | Accounting system | Billing |
| Date, method and reference of submission | Portal, electronic or email confirmation | Billing |
| Status: submission received, accepted for processing or rejected, with the reason | Portal status, customer’s payables team | Billing |
| Exception owner and next action | Daily check | Billing |
| Contractual due date, and the date handed to collections | Customer terms; register | Billing |
Who keeps it accurate
Updates its own fields by the agreed daily cut-off.
Maintains the master register and closes the daily tie-out.
Takes over whenever the owner is away.
03 · When you can bill
Know when each order can be billed
Many delays start with uncertainty about whether an order can be invoiced yet. Agree the billing event for each type of order in the quote and the order confirmation, so nobody has to decide later.
| Order type | Billing event | Watch for |
|---|---|---|
| Stock or standard orders | On shipment, or on delivery if the terms say so | Partial shipments: invoice what shipped the same day, if the terms allow partial invoicing |
| Orders that need inspection or acceptance | On acceptance | If your signed terms include an acceptance period, goods may count as accepted when it ends; otherwise get written sign-off |
| Long or custom jobs | By stage, for example 30% at order, 40% at production complete, 30% on delivery | Set stages around material commitment, production, inspection and delivery; name the evidence for each |
| Deposits | At order confirmation | Buy materials only once the deposit is paid |
| Tooling and engineering | As agreed, often on approval of first parts | Bill separately from the parts |
| Freight, surcharges and price changes | Once agreed in writing, on the invoice for the goods | Not billable until the customer agrees them in writing or on a revised PO |
| Standing orders with releases | On each release shipped | No release without a valid release number |
In the example, the equipment maker is billed on shipment through its portal, the home-improvement chain on shipment once its shipping notice is sent, the distributor on each release against a standing order, and contractors by stage.
Default rule
No order entry and no release without a valid PO or release number.
If a customer needs goods before the number arrives
- Record who approved shipping without it, and when.
- Ask the buyer for the number the same day.
- Log it in the register as an exception with an owner.
04 · Customer requirements
Know each customer’s invoicing requirements
Large buyers match each invoice to their purchase order and their record of what arrived, and retailers also match it to your shipping notice. A rejected invoice can delay approval and payment while it is corrected and resubmitted, so record the date of the first submission, any rejection and the resubmission.
Keep a billing requirements profile for every customer with special requirements, starting with the largest and most complex.
When to bill
- Billing event
- On shipment
- Terms basis
- 60 days from receipt of goods
On the invoice
- PO
- PO and line number; check the quantity left on the PO
- Format
- One invoice per PO per shipment
- Items
- Customer part number, quantity in each, US dollars
- Tax
- Exempt for resale; certificate on file, renewal date tracked
What to attach
- Shipping
- Packing slip and bill of lading
- Quality
- Certificate of conformance with lot numbers
How to submit
- Method
- Supplier portal only
- Rules
- PDF under the size limit; no duplicates
- Contacts
- Buyer, payables contact, payables supervisor
- Rejections
- Shown in the portal; correct and resubmit; call payables if rejected twice
Where a customer claims a sales-tax exemption, keep its certificate with the profile and confirm the treatment with your tax adviser.
How to do itFix the common errors at the source
| Error | Usual cause | Fix at the source |
|---|---|---|
| Missing or wrong PO number | Order entered without it | Apply the default PO rule in section 03 |
| Price differs from the PO | Price change not put on the PO | Get the PO revised before shipping |
| Quantity differs | Invoice raised from the order, not the shipment | Invoice from the shipping record |
| Wrong unit of measure | Cases on the invoice, each on the PO | Record the customer’s unit in its profile |
| Missing certificate | Quality document not ready at shipment | Make certificates part of the shipping checklist |
| Invoice before the shipping notice | Documents sent out of order | Send the shipping notice when the goods leave; invoice after it |
| Wrong bill-to company | Customer record set up wrongly | Check the legal name against the credit application |
Managing customer portals
- Keep the login for each portal with a named backup user
- Record the submission reference in the register
- Check each portal’s status at the daily check
- Read the rejection reason, correct and resubmit the same day
- Keep a named payables contact for each portal customer
- Agree in writing how to submit if the portal is down
05 · Daily check
Tie out shipments to invoices every day
Every shipment or stage that can be billed should end the day with an invoice, or with a logged reason why not. A short daily check proves it, and it catches the shipment that would otherwise wait for the weekly run.
Check shipment by shipment first: every shipment reference in today’s shipping log must appear in the register with an invoice reference or an open exception. Then check that the dollars agree.
Today’s shipments and completed stages go into the register.
Each one is matched to its order, PO and the customer’s requirements.
Ready: invoice it. Not ready: log the reason, owner and next action.
Submit through the customer’s channel; confirm it is accepted for processing.
Pass the invoice reference and contractual due date to collections.
How to do itThe example register: three of today’s billing events
| Billing event | Customer | Value | Status today | Next step |
|---|---|---|---|---|
| 2291-S1 | Contractor 1 | $6,800 | Accepted for processingShipment 4512; invoice submitted by email the same day | Handed to collections: due Dec 16, 30 days from the invoice date |
| 2296-S2 | Equipment maker | $9,600 | ExceptionShipment 4518; certificate of conformance missing; not submitted | Quality sends the certificate today; invoice submitted in the portal and reference recorded |
| 2299-S1 | Contractor 3 | $5,600 | Not yet billableShipment 4521; delivered, goods acceptance pending under the signed terms | Ask for sign-off; invoice on acceptance or when the acceptance period ends |
How to do itThe daily check in about 15 minutes
- Pull today’s shipments and completed stages into the register.
- Match each shipment reference to an invoice reference or an open exception.
- Check the dollars: shipped equals invoiced plus logged exceptions.
- Log anything not invoiced with its reason, owner and next action.
- Check yesterday’s submissions: received, accepted for processing or rejected.
- Hand accepted invoices to collections with the reference and due date.
The 15 minutes covers the check itself, not preparing the invoices. If your system can create the invoice from the shipping confirmation, switch that on and use the check for exceptions only.
| Who | Does what |
|---|---|
| Shipping | Records shipment references, quantities and ship dates in the register the same day |
| Production and quality | Confirm stage completion and supply certificates at shipment |
| Sales or customer service | Fix order data before shipment: PO, price, changes |
| Billing | Keeps the master register, runs the daily check, submits invoices, owns exceptions and hands invoices accepted for processing to collections |
06 · Exceptions
Manage exceptions and work not yet billed
Some shipments cannot be invoiced on the day. As a default, give each one an owner the same working day and review it at the next daily check, then adjust the timing to the customer’s terms.
| Exception | Immediate action | Owner | Escalate to |
|---|---|---|---|
| Missing PO or release, or release refused | Ask the buyer for the number the same day; record who approved shipping | Customer service | Sales lead, then owner |
| PO expired or quantity used up | Ask for a revised PO before the next shipment | Customer service | Sales lead |
| Price differs, or order changed without a PO update | Get the PO revised; do not invoice a price the customer has not agreed | Sales | Owner |
| Partial shipment | Invoice what shipped, if the terms allow; record the balance | Billing | Customer service |
| Quality document missing | Quality sends it the same day; then submit | Quality | Production lead |
| Shipping notice required first | Send the notice; submit the invoice after it | Shipping | Billing |
| Portal down | Use the agreed fallback route; record the date you tried | Billing | Customer’s payables contact |
| Portal rejection | Read the reason, correct and resubmit the same day | Billing | Customer’s payables contact after a second rejection |
| Customer says goods not received | Send proof of delivery; open a carrier claim if needed | Shipping | Sales |
| Goods acceptance pending | Ask for sign-off; rely on an acceptance period only if your signed terms include one | Sales or project lead | Owner |
Three kinds of work not yet invoiced
Sort everything in the register that has not been invoiced by what stands in the way. Each kind needs a different action.
Billable now
$70,000
- Contractor stages complete, held for month-end
Next: invoice tomorrow
Billable once a blocker clears
$20,000
- Equipment maker shipments missing certificates
Next: quality sends certificates this week
Not yet billable: authorization needed
$15,000
- Distributor shipment with no release number
Next: get the release number from the buyer
The $105,000 is not cash available today. It becomes cash only once it is invoiced, accepted for processing and paid on the customer’s terms.
07 · Measure
Measure it and keep it running
Billing improves when the checks happen on fixed days. Set the routine up once, then keep the cadence.
| When | Activity | Output |
|---|---|---|
| Setup, week 1 | Start the register; measure three months of billing gaps | Register and baseline |
| Setup, week 2 | Write requirements profiles, largest and most complex customers first; agree billing events by order type | Customer profiles |
| Setup, week 3 | Start the daily check with a named owner and backup | Daily routine |
| Setup, week 4 | Run the first weekly review of exceptions and work not yet invoiced | First review |
| Daily | Tie out shipments to invoices; log exceptions; hand off accepted invoices | Updated register |
| Weekly | Review exceptions, rejections and work not yet invoiced | Actions and owners |
| Monthly | Review the measures below and the most common cause of rejections | Monthly review |
| Quarterly | Refresh customer profiles; check billing events in new contracts | Updated profiles |
Measures to track
A billing event is eligible once it has occurred. Items not yet billable, such as goods awaiting acceptance, stay out of both rates.
Days from billing event to first submission, averaged by invoice value
Value submitted on the billing-event day ÷ value of all billing events eligible for billing that day
Value of eligible billing events not submitted because of an unresolved exception ÷ value of all eligible billing events
Invoices accepted without correction ÷ invoices submitted. 95% means one correction in every 20
Value in the register that could be invoiced today, and its oldest item in days
Number and value of exceptions open more than five working days
Sources: FASB Accounting Standards Codification 606-10-55-81 to 55-84 (bill-and-hold arrangements); B. Sands and T. Bolte, “It’s My Retainage and I Want It Now! Fundamentals to Requirements and Entitlement for Retainage,” ConsensusDocs, July 10, 2025 (private construction contracts).
1. Billing register one row per billing event; kept by the billing owner, updated daily
| Billing-event reference | Order, shipment, PO or release | Items, quantity | Shipped: quantity, date | Billing event, date | Documents ready | Invoice number, date | Submitted: date, method, reference | Status | Exception owner, next action | Due date; to collections |
|---|---|---|---|---|---|---|---|---|---|---|
| Order number + event number | Order confirmation, PO, packing slip | Customer PO | Packing slip | Proof of delivery or sign-off | Requirements profile | Accounting system | Portal or email | Portal status | Daily check | Customer terms |
2. Customer billing requirements one column per customer with special requirements
| Requirement | Customer 1 | Customer 2 |
|---|---|---|
| Billing event | ||
| Payment terms basis | ||
| PO requirements | ||
| Invoice format | ||
| Item details | ||
| Shipping documents | ||
| Quality documents | ||
| Submission method | ||
| Submission rules | ||
| Contacts | ||
| Rejections | ||
| Tax treatment and exemption documents |
3. Exceptions and work not yet invoiced review weekly; track unapproved charges separately
| Date | Customer | Order | Value | Exception | Kind: now, blocker or authorization | Owner | Next action | Bill by |
|---|---|---|---|---|---|---|---|---|
4. Monthly review
| Month | Billing gap (days) | Same-day billing rate | Billing exception rate | First-pass acceptance | Billable now, not invoiced | Exceptions over five days | Most common cause | Fix at the source |
|---|---|---|---|---|---|---|---|---|
5. What to say
| When | Message |
|---|---|
| Deposit request | “Thank you for order [number]. As agreed, a deposit of [amount] is due before we order materials. Our invoice [number] is attached.” |
| Missing PO | “We shipped [items] today on your instruction of [date]. Please send the PO or release number so we can invoice today.” |
| Acceptance, where terms allow | “[Order] was delivered on [date]. Could you confirm acceptance by [date]? Under our agreed terms, goods are treated as accepted [number] days after delivery unless you tell us otherwise.” |
| Stage complete | “Stage [name] of [job] was completed on [date]; the evidence is attached. Our invoice [number] for [amount] follows, as agreed.” |
| Change order | “Before we make the change to [item], please confirm the revised price of [amount] in writing or on a revised PO.” |
| Portal rejection | “Our invoice [number] was rejected in your portal on [date] for [reason]. We have corrected it and resubmitted it today, reference [number]. Please let us know if anything else is needed.” |